QTS Data Center

Overview

QTS Mega Data Center campus, featuring its own on-site Georgia Power substations and direct fiber access to a wide variety of carrier alternatives.

Project Description / Details

Site development across five phases of work for a new data center, an onsite Georgia Power substation, an expansion of the new data center, a second onsite Georgia Power substation, and two additional data centers.

BACK TO PROJECTS

Additional Details

Service Type: Mission Critical

Location: Atlanta, Georgia

Additional Project Details:

  • 48-acre redevelopment of a former Mead Westvaco manufacturing plant
  • Disposed of existing contaminated non-hazardous soils in a subtitle D landfill
  • Moved 300,000 CY of material
  • Exported 90,000 CY of material offsite from the project.
  • Installed 10’x9’ box culvert and 18” sanitary sewer line for 1,800lf to re-route the existing alignment
  • Shored the culvert and sanitary line started in 45’ deep excavation which required a lagging wall design
  • Project meets Atlanta’s green infrastructure requirements and has three underground detention systems with infiltration