Facebook Social Circle (Project Tipin)
Overview
The data center is 970000 sqft. Meta;s, formerly Facebook, data center in Social Circle just East of Atlanta, will be powered by 100 percent clean and renewable energy and cooled using outside air.
Project Description / Details
Located at 100 Move Fast Way in Social Circle, Ga., the first phase of the data center broke ground in 2018 with a 970,000 sq ft data center. The second phase is a three-building expansion that will add 1.5 million sq ft to the existing two-building campus.
Upon full build-out, the Facebook/Meta investment will total more than $1 billion and add more than 200 jobs. To achieve the company’s objective of powering its global operations with 100 percent renewable energy, the firm invested in six solar energy developments.
Plateau Excavation is leading the site development with clearing, grading, erosion control, excavation, storm drainage, sanitary sewer, water (fire, domestic, irrigation), as well as chemic stabilization and blasting.
Additional Details
Service Type: Mission Critical
Location: Social Circle, Georgia
Additional Project Details:
- 281 total acres
- 209,733 cubic yards of earth moved